MakeDynamics Extension for Dynamics 365 Business Central

Visual Production Scheduler & Finite Engine

Transform complex manufacturing into a synchronized, visual, multi-level JIT flow. Combine high-precision Gantt intelligence with autonomous finite capacity leveling and zero-risk simulation sandboxes.

✓ Multi-Level BOM JIT Precedence ✓ Real BC Shop Calendar Sizing ✓ 100% Sandbox Protected
Explore Live Demo ↓
100% Native Business Central Extension Zero External Cloud Dependencies
Microsoft Dynamics 365 Business Central
Visual Gantt View
MakeDynamics Visual Production Scheduler Dashboard
MakeDynamics Visual Production Scheduler
Live Multi-Level Precedence & Shop Floor Gantt
Interactive Gantt
The Manufacturing Dilemma

Why Standard Business Central MRP Struggles on the Floor

Standard ERP engines assume endless capacity, stacking operations blindly on due dates. MakeDynamics replaces blind dates with physical machine truth.

Connected Smart Manufacturing Facility
Standard BC MRP
153% Overload
Bottleneck Machine Overloaded
MakeDynamics VPS
98.6% Balanced
Strict 72.0h Ceiling
1

The Infinite Capacity Fallacy

Standard MRP stacks multiple days of machining operations onto the same shift because sales orders share the same due date. The result is instant floor bottlenecks, expediting stress, and missed shipments.

2

Cluttered Floor WIP & Blocked Cash

When sub-assemblies are produced weeks before final assembly can touch them, physical factory aisles get blocked with pallets. Working capital is locked up in stagnant inventory.

3

Zero Simulation Sandboxes

In standard BC, any test schedule change immediately modifies live routing lines. Planners cannot safely test: 'What if a critical machine breaks down?' or 'Can we take an expedited rush order?'

Shop Floor Precision

Working Shift & Calendar Mathematics

Visual scheduling anchored in the physical reality of your factory calendar — respecting shifts, unpaid breaks, and machine maintenance windows.

Shift 1 (Day) 07:00 – 16:00

9.0h Shift Window

Gross operational window covering primary fabrication, tooling prep, and high-volume machining.

Gross Time 9.0 Hours
Unpaid Lunch Break -60 Minutes
Net Machine Capacity 8.0 Net Hours
Automatic operation split prevents scheduling across lunch breaks.
24h Factory Dial

Continuous Flow Engine

Green = Shift 1 & 2 operational time. Gray = Unscheduled off-shift maintenance windows.

Shift 2 (Night) 16:00 – 01:00

Overnight Precision

Seamlessly schedules long-duration CNC and molding operations across midnight date boundaries.

Gross Time 9.0 Hours
Unpaid Dinner Break -60 Minutes
Net Machine Capacity 8.0 Net Hours
Automatic cross-midnight timestamps for accurate shop dispatch.
Live Interactive Simulation

Autonomous Finite Capacity Leveling

Toggle between standard Business Central infinite stacking and MakeDynamics autonomous leveling to see how bottleneck machine overloads are smoothed into valid shift slots.

Target Resource
Critical Bottleneck Work Center
Peak Daily Load
15.5 hrs (129%)
Exceeds 12.0h Two-Shift Ceiling
Daily Overload Excess
7.0 hrs OVER LIMIT
62.0h weekly work stacked across 3 days
Schedule Feasibility
Dispatch Failure
High Late Delivery Penalty
Daily Load Distribution (Mon – Sat · 62.0h / wk conserved) Finite Capacity Ceiling: 12.0h / day (72h/wk)
12.0h / DAY MAX (72h/wk)
15.5h
Mon
14.0h
Tue
8.5h
Wed
13.5h
Thu
10.5h
Fri
0.0h
Sat
Standard Business Central Behavior (62.0h Total Weekly Work): Operations from multiple production orders are stacked onto Monday (15.5h), Tuesday (14.0h), and Thursday (13.5h) above the 12.0h/day two-shift net ceiling. Because standard BC assumes infinite daily machine availability, the planner receives no warning until shop floor machines jam.
Two Mathematical Engines

Strategic Dual Scheduling

Different manufacturing models require different mathematical optimization. Choose Lean JIT to slash WIP or Strict Due Date to maximize machine asset utilization.

Approach 1: Lean JIT Backward Scheduling

Pull System Synchronization

Calculates backwards from the promised customer delivery date. Every sub-assembly operation is scheduled as late as possible without risking final assembly readiness.

✓ Minimizes Floor WIP: Zero pallets crowding aisles waiting for downstream assembly.
✓ Working Capital Relief: Raw materials are consumed immediately prior to assembly.
✓ Ideal For: High-mix / low-volume, customized machinery, make-to-order manufacturing.
Key Business Result -42% Reduction in Stagnant WIP
Approach 2: Strict Due Date Forward Finite Push

Asset Utilization Maximization

Schedules forward from earliest raw material availability, densely packing work into open finite slots to maximize throughput and ensure critical hard deadlines are met.

✓ Maximizes Spindle Time: Keeps expensive CNC & laser centers running with zero idle gaps.
✓ Buffers Against Material Delays: Finishes sub-assemblies early to absorb supply chain shocks.
✓ Ideal For: High-volume fabrication, capital-intensive lines, strict contractual penalty orders.
Key Business Result +28% Higher Machine Utilization
What-If Decision Intelligence

Zero-Risk Simulation Sandboxes

Test rush orders, machine breakdowns, or overtime shifts in an isolated sandbox. Compare KPI impact side-by-side, then publish back to live routing lines with 1 click.

Step 1 Zero Live Data Risk

Isolate in Sandbox

Clones live production orders into an isolated staging sandbox. Drag and drop operations freely without affecting active floor execution.

Step 2 Delta Analytics

Inspect & Compare KPI Matrix

Evaluates on-time delivery %, bottleneck utilization, and setup changeover times between the live plan and your simulation scenario.

Step 3 Two-Tier Commit

1-Click Verified Publish

Once verified, commits optimized start/end timestamps directly to standard Business Central production routing records with full rollback audit trail.

Step 1 | Isolated Staging Clone Sandbox Active
MakeDynamics Visual Production Scheduler Simulation Dashboard
Live Production Shielded — Clone Created in 0.4s

48 released production orders and 196 routing lines cloned into Scenario A. Shop floor terminals remain locked to the current verified baseline.

Live Routing Risk
0% Impact
Cloned Orders
48 Orders
Sandbox Mode
Read/Write
Enterprise Ready

Engineered for Microsoft Cloud Security

Built 100% within the native Microsoft Business Central architecture. Zero external server dependencies, zero external data storage, fully isolated within your tenant.

🔒

100% Native Business Central Extension

Certified Microsoft Dynamics 365 Business Central AppSource extension. Deploys cleanly into your cloud or on-premise tenant with zero external infrastructure.

🛡️

Zero External Data Egress

Your production orders, routings, and bills of materials never leave your Microsoft Azure boundary. Zero third-party web services or sync brokers.

⚡

Role-Based Access & Security

Fully inherits standard Business Central user roles and permission sets. Planners manage simulations and publishing, while shop floor supervisors operate in view-only dispatch mode.

Enterprise Verification

Architecture & Compliance

✓ Microsoft Cloud Certified
✓
Tenant Data Residency
All data stays inside your existing Microsoft Business Central database instance.
✓
Zero Third-Party Middleman
Direct in-memory execution with no external API webhooks or SaaS sync delays.
✓
Major Wave Compatibility
100% compliant with Microsoft BC Spring and Fall major release updates.
✓
Instant Sandbox Deployment
Installs in minutes on any Business Central Cloud Sandbox or On-Premise test tenant.
Ready For Your Production Floor

Experience Finite Production Scheduling on Your Own Data

Install MakeDynamics Visual Production Scheduler directly into your Business Central sandbox. Includes full feature access, onboarding support, and zero live data commitment.

✓ Instant Sandbox Deployment ✓ No Credit Card Required ✓ Direct Support from Certified Engineers